<% Option Explicit 'You must dim all variables before using them. Response.Buffer = True 'Hold web pages on the server until they are done Response.Expires = 0 'Since this site is entirely data driven, web pages should expire as soon as they are created. On Error Resume Next 'Declare all variables. Dim strSQL Dim dataconn Dim rsHighSchools Dim rsSatelliteSchools Dim rsElemSchools Dim strOutput Dim strGrades Dim strBegGrade Dim strEndGrade Dim strInterim Dim strCounter Dim strTimes '---- CursorTypeEnum Values ---- Const adOpenForwardOnly = 0 Const adOpenKeyset = 1 Const adOpenDynamic = 2 Const adOpenStatic = 3 '---- LockTypeEnum Values ---- Const adLockReadOnly = 1 Const adLockPessimistic = 2 Const adLockOptimistic = 3 Const adLockBatchOptimistic = 4 '---- CursorLocationEnum Values ---- Const adUseNone = 1 Const adUseServer = 2 Const adUseClient = 3 Const adUseClientBatch = 3 'Get connection to database Set dataconn = Server.CreateObject("ADODB.Connection") dataconn.ConnectionString ="PROVIDER=MSDASQL;DRIVER={SQL Server};SERVER=198.203.127.110;DATABASE=theMap;UID=web_visitor;PWD=web_visitor;" dataconn.Open %> Kilgour, FMP Architectural Drawings




Kilgour Architectural Drawings
Architect: Champlin/Haupt Architects, Inc.

Aerial View


A new addition behind the existing building will hold a gymnasium and a two-story classroom wing. A new sunken courtyard area will help brighten up the basement-level lunchroom and create a plaza entrance for the community into the new gym. A new driveway entrance off Herschel Avenue will provide vehicle turn-around space and lead to a student drop-off area. The soccer field will be shortened but will remain in use; a new 31-space parking lot will be added at the end of the field. Kilgour's renovation and addition will be respectful of the 83-year-old building's architecture, keeping the existing white-pillared facade and duplicating the building's red brick and arched windows on the addition.

Courtyard View


A sunken courtyard will open off the basement lunchroom and lead up into the entrance plaza to the new gym.

Addition View


Outside view of the new gymnasium showing the plaza entrance leading to the glass-walled entrance.

Classroom View


Outside view of the new two-story classroom wing, which will feature classrooms grouped with Extended Learning Areas for tutoring and special instruction.
 


Home | General Information | Schools | Student Programs/Choices | Calendar/Activities/Events
Enrollment | Departments/Administrative Offices | Employment Opportunities