March 2005
– The left photo shows
the view down the stairwell from the Mechanical Equipment room. On the
right, the exterior brick for the new classroom wing is being
completed. |
 |
 |
January 2005
– In the photo on the left, roof support trusses are being assembled
for the new administrative area. On the right, roofing is being
installed on the new gymnasium.
|
 |
 |
November 2004
– On the left, distribution conduits for the new classroom area are
installed prior to pouring concrete for the second floor. On the
right, iron workers attach bracing to the roof trusses in the new
gymnasium.
|
 |
 |
September 2004
– In the photo on the left, workers place concrete for the floors of the
administration area while on the right, the concrete block walls for
the classroom area are being constructed.
|
 |
 |
August 2004
– On the left, waterproofing and
compacted stone is being placed for the sub-base of the new administration area. On
the right, a finisher prepares the final finish on
the classroom floors with a power trowel machine.
|
 |
 |
June 2004
– Reinforcing cages are getting ready to be set into the hole drilled for the deep foundations of the
building. On the right, installation of the new storm sewers is
beginning on the site.
|
 |
 |
May 2004
– The process of developing the new
site is beginning, including raising the elevation of the old parking
area to make a level site. Ironworkers are tying reinforcing bar cages
for the deep foundations of the new Roll Hill Elementary school.
|
 |
 |
| March 2004 –
The earthwork contractor is currently working on the east side of the
multi-use field preparing this location for the temporary silt basin
designed for drainage during construction. In the photo on the right,
the earthwork contractor is installing the geogrid and stone for the
preparation of the undercut required in the building pad area. |