<% Option Explicit 'You must dim all variables before using them. Response.Buffer = True 'Hold web pages on the server until they are done Response.Expires = 0 'Since this site is entirely data driven, web pages should expire as soon as they are created. On Error Resume Next 'Declare all variables. Dim strSQL Dim dataconn Dim rsHighSchools Dim rsSatelliteSchools Dim rsElemSchools Dim strOutput Dim strGrades Dim strBegGrade Dim strEndGrade Dim strInterim Dim strCounter Dim strTimes '---- CursorTypeEnum Values ---- Const adOpenForwardOnly = 0 Const adOpenKeyset = 1 Const adOpenDynamic = 2 Const adOpenStatic = 3 '---- LockTypeEnum Values ---- Const adLockReadOnly = 1 Const adLockPessimistic = 2 Const adLockOptimistic = 3 Const adLockBatchOptimistic = 4 '---- CursorLocationEnum Values ---- Const adUseNone = 1 Const adUseServer = 2 Const adUseClient = 3 Const adUseClientBatch = 3 'Get connection to database Set dataconn = Server.CreateObject("ADODB.Connection") dataconn.ConnectionString ="PROVIDER=MSDASQL;DRIVER={SQL Server};SERVER=198.203.127.110;DATABASE=theMap;UID=web_visitor;PWD=web_visitor;" dataconn.Open %> Pleasant Hill, FMP Photos




Pleasant Hill School
Follow the progress as a new Pleasant Hill School is constructed on a five-acre site along W. North Bend Road adjacent to the current school. New photos will be added regularly.

March 2005The left photo shows the completed masonry veneer of the kitchen and gym outer walls. On the right is the stud framing for the administrative office area.
January 2005The second floor structural framing and masonry walls are shown on the left. On the right is the structure of the gym roof.
November 2004 On the left, load bearing masonry is being erected for the classroom wing. On the right preparations are beginning to pour the gym floor.
September 2004 An underground fire water main and adjacent domestic water (drinking water) main are being installed. On the right looking northeast, the library masonry is being installed. The gymnasium block work is in the background.
August 2004 Construction work begins with clearing the site and stockpiling topsoil. In the photo on the right, workers are pouring a concrete footer for an exterior masonry wall on the south one-story building.