<% Option Explicit 'You must dim all variables before using them. Response.Buffer = True 'Hold web pages on the server until they are done Response.Expires = 0 'Since this site is entirely data driven, web pages should expire as soon as they are created. On Error Resume Next 'Declare all variables. Dim strSQL Dim dataconn Dim rsHighSchools Dim rsSatelliteSchools Dim rsElemSchools Dim strOutput Dim strGrades Dim strBegGrade Dim strEndGrade Dim strInterim Dim strCounter Dim strTimes '---- CursorTypeEnum Values ---- Const adOpenForwardOnly = 0 Const adOpenKeyset = 1 Const adOpenDynamic = 2 Const adOpenStatic = 3 '---- LockTypeEnum Values ---- Const adLockReadOnly = 1 Const adLockPessimistic = 2 Const adLockOptimistic = 3 Const adLockBatchOptimistic = 4 '---- CursorLocationEnum Values ---- Const adUseNone = 1 Const adUseServer = 2 Const adUseClient = 3 Const adUseClientBatch = 3 'Get connection to database Set dataconn = Server.CreateObject("ADODB.Connection") dataconn.ConnectionString ="PROVIDER=MSDASQL;DRIVER={SQL Server};SERVER=198.203.127.110;DATABASE=theMap;UID=web_visitor;PWD=web_visitor;" dataconn.Open %> Midway, FMP Photos




Midway School
Follow the progress as a new home for Midway is built on a new site on Glenmore Avenue. New photos will be added regularly.

March 2005The left photo shows that the mechanical room is well underway with installation of HVAC piping. On the right, the exterior brickwork of north end of the academic area nears completion.
January 2005Metal stud framing on the east side of the academic area nears completion. On the right the common area roof nears completion and scaffolding has been erected for the start of exterior brick work.
November 2005 –  On the left, the plumbing contractor begins the "rough-in" for bathrooms on the first floor of the academic area. On the right, the general contractor prepares to pour the 2" topping slab for two classrooms on the second floor of the academic area.
September 2004 The east academic area exterior east wall nears completion and awaits steel erection. On the right, the gymnasium wall is being erected.
August 2004 A portion of the slab has been poured in the Academic Area and workers are putting up interior walls. The underground feeding the main electrical room is complete and panel cans now are being installed.
June 2004 The Northwest parking lot has been brought to sub-grade level with suitable and stable material. In the photo on the right, the earth work contractor has completed the Academic Area portion of the building pad and awaits the results of the settlement monitors. This area is anticipated to be released soon for footings and foundations.

May 2004 Contractors continue to use existing roads for entering the project site. These roads will be demolished upon installation of the new drive which is anticipated to start in the near future. The earthwork contractor continues to haul in suitable materials for the parking lot sub-base.

April 2004 – On the left, the earthwork contractor continues to remove unsuitable material in the Northwest parking lot, while on the right suitable stable material is being stock piled to be used under the new drives and parking lots.

March 2004 – The earthwork contractor is currently working on the east side of the multi-use field preparing this location for the temporary silt basin designed for drainage during construction. In the photo on the right, the earthwork contractor is installing the geogrid and stone for the preparation of the undercut required in the building pad area.