| Click on an image to get additional information about that particular
school: |
|
 |
This goes to a page
outlining the Facilities Master Plan recommendation for the
school. |
|
 |
This links to simple floor plans for the school. |
|
 |
This link will show
construction or renovation in progress. |
|
 |
This goes to a page on the Ohio School
Facilities Commission (OSFC) web site with more detailed information
on this particular school such as bid deadlines, contacts and
additional photos. |
<%
'-----------------------------------ELEMENTARY SCHOOLS--------------------------------------- %>
|
Opened
(In order of opening)
|
Rockdale
New Construction/Existing
Site |
 |
 |
 |
 |
(Avondale,
335 Rockdale Ave)
Construction completed on a 86,160-square-foot school for 650 students
in grades K-8. The new school is built on the site of the district's
former Condon School. Students moved into new building on January 3,
2005. Dedication and ribbon-cutting ceremony was January 13,
2005.
Opening Day
Dedication
Architect: GBBN Architects Inc. + WA Inc.
Building Construction Cost: $13,985,500
Total Project Cost (includes such things as site
preparation, demolition): $16,789,056 |
Midway
New Construction/New
Site |
 |
 |
 |
 |
(Westwood, 3156
Glenmore Ave.) Construction completed on a 76,800-square-foot school for 550 students in grades
K-8 in August 2005. Students moved into new building in August 2005.
Dedication and ribbon-cutting ceremony was September 2, 2005.
Architect: Voorhis, Slone, Welsh, Crossland Architects Inc.
Building Construction Cost: $13,356,490
Total Project Cost
(includes such things as site preparation, demolition): $18,414,380 |
Roll Hill
New Construction/Existing
Site |
 |
 |
 |
 |
(North Fairmount,
2411 Baltimore)
Construction completed on a 84,000-square-foot school for 650 students in
grades K-8. Old
school building demolished December 2003-January 2004. Students moved into new building
August
2005. Dedication and ribbon-cutting ceremony was October 6, 2005.
Architect: Roth Partnership/Lesko Associates
Building Construction Cost: $11,047,765
Total Project Cost
(includes such things as site preparation, demolition): $12,978,126 |
Winton Hills
New Construction |
 |
 |
 |
 |
(Winton Place,
5300 Winneste Ave.)
Construction completed on a 66,001-square-foot school for 450 students in grades
K-8. Students moved into new building August
2005. Dedication and ribbon-cutting ceremony was September 15, 2005.
Architect: BHDP Architecture
Building Construction Cost: $10,118,220
Total Project Cost
(includes such things as site preparation, demolition): $11,718,497 |
Pleasant Hill
New Construction/Existing
Site |
 |
 |
 |
 |
(College Hill,
1350 W. North Bend Rd)
Construction completed on a 84,000-square-foot school for 650 students in grades
K-8. Students moved into new building in November 2005. Dedication
and ribbon-cutting ceremony was held October 20, 2005.
Architect: Burgess & Niple Limited
Building Construction Cost: $10,624,974
Total Project Cost
(includes such things as site preparation, demolition): $13,176,469 |
Riverview East Academy
New Construction/New Site |
 |
 |
 |
(Columbia Tusculum,
3555 Kellogg Ave)
Construction completed on a 105,000-square-foot school for 615 students in
grades K-12. Students moved into the new building on January 3, 2006.
The dedication and ribbon-cutting ceremony was held on January 12,
2006.
Architect: SFA
Architects Inc. + Alexander Camabean & Associates
Building Construction Cost: $17,653,73
Total Project Cost
(includes such things as site preparation, demolition): $22,705,869 |
Woodward High School
New Construction/Existing
Site |
 |
 |
 |
(Bond Hill, 7005
Reading Rd) Construction completed on a 261,870-square-foot school for 1,200 students with
three wings designed for three career-technical programs. This is CPS first
new high school building since 1962. Students moved into the new
building as of the first day of the 2006-07 school year, on August 22,
2006. The dedication and ribbon-cutting ceremony was held on September
15, 2006.
Architect: Steed Hammond Paul + DH Architects
Building Construction Cost: $40,053,392
Total Project Cost
(includes such things as site preparation, demolition): $47,765,066 |
Cheviot
Renovation |
 |
 |
 |
(Cheviot, 4040
Harrison Ave) Construction completed
on a 74,000-square-feet school for 550 students. The addition was
finished in November 2005. Students moved into the newly renovated
building as of the first day of the 2006-07 school year, on August 22,
2006. The dedication and ribbon-cutting ceremony was held on November
2, 2006.
Architect:
Glaserworks
Building Construction Cost: $13,621,960
Total Project Cost
(includes such things as site preparation, demolition): $16,396,797 |
Rees E. Price School
New Construction/New
Site (Whittier Annex) |
 |
 |
 |
(Price Hill, 1228
Considine Avenue) Construction completed on an
84,000-square-foot school for 650 students as the new home for former
Whittier School beginning August 2006.
Architect:
McGill Smith Punshon Inc. and DeJong
Building Construction Cost: $11,238,552
Total Project Cost
(includes such things as site preparation, demolition): $13,211,769 |
Ethel M. Taylor Academy (formerly Millvale)
New
Construction/New Site |
 |
 |
 |
(Millvale, 1930
Fricke Road)
Construction completed on a 66,100-square-foot school for 450
students. The building opened for students on January 3, 2007. The dedication
and ribbon-cutting ceremony was held on February 1, 2007.
Architect: URS
Corp.
Building Construction Cost: $10,516,014
Total Project Cost
(includes such things as site preparation, demolition): $13,675,543 |
Shroder
New Construction/New
Site (Eastwood) |
 |
 |
 |
(Madisonville,
5030 Duck Creek Rd)
Construction completed on a 98,000-square-foot school for 600 students.
The building opened for students on January 3, 2007.
The dedication and
ribbon-cutting ceremony was held in March 2007.
Architect: Voorhis,
Slone, Welsh, Crossland Architects Inc.
Building Construction Cost: $15,070,987
Total Project Cost
(includes such things as site preparation, demolition): $17,858,907 |
Withrow High School
Renovation |
 |
 |
 |
(Hyde Park) Withrow
University moved into renovated north wings over Spring Break 2007.
Withrow International moved into renovated south wings in April
2006. Gymnasium, kitchen and cafeteria completed the renovation in Fall 2006.
Demolition of vocational building, renovation of stadium and
completion of site work finished in August 2007.
Architect: Cole+Russell and Fanning/Howey
Building Construction Cost: $38,539,594
Total Project Cost
(includes such things as site preparation, demolition): $43,145,719 |
Roberts
New Construction/Existing Site |
 |
 |
 |
(Price Hill)
Construction completed on the 95,000-square-foot school for 750
students. Building opened for students in August 2007.
The dedication and ribbon-cutting ceremony was held in October 2007.
Architect: McGill
Smith Punshon Inc. and DeJong
Building Construction Cost: $16,146,347
Total Project Cost
(includes such things as site preparation, demolition): $17,368,405 |
Douglass
New
Construction/New Site |
 |
 |
 |
(Walnut Hills)
Construction completed on
74,000-square-foot school for 550 students.
Building opened for
students in August 2007.
The dedication and ribbon-cutting ceremony was held in May 15, 2008.
Architect: DNK
Architects + DH Architects
Building Construction Cost: $13,078,725
Total Project Cost
(includes such things as site preparation, demolition): $15,992,681 |
Hays-Porter
New Construction/Existing Site |
 |
 |
 |
(West End, 1030
Cutter Street)
Construction completed on 66,100
square-foot school for 450 students.
Building opened for
students in August 2007.
Architect: Moody-Nolan Inc.
Building Construction Cost: $12,807,775
Total Project Cost
(includes such things as site preparation, demolition): $15,153,247 |
Academy of World Languages
New Construction/Existing Site |
 |
 |
 |
(Evanston) Construction completed on 84,144-square-foot
school for 650 students.
Building opened for
students in December 2007.
The dedication and ribbon-cutting ceremony was held in January 2008.
Architect: McGill Smith Punshon Inc.
Building Construction Cost: $14,881,079
Total Project
Cost (includes such things as site preparation, demolition):
$14,917,705 |
Bond Hill
New Construction/Existing Site |
 |
 |
 |
(Bond Hill) Construction completed on
66,100-square-foot school for 450 students. Demolition of old building
completed Summer 2006. New building opened for students in March 2008.
The dedication and ribbon-cutting ceremony was held in
May 2008.
Architect: Steed Hammond Paul + DH Architects
Building Construction Cost: $12,754,244
Total Project Cost
(includes such things as site preparation, demolition):
$14,658,562 |
Mt. Airy
New Construction/Existing Site |
 |
 |
 |
(Mt. Airy) Construction completed on
84,144-square-foot school for 650 students. Demolition of old building
completed Fall 2006. New building opened for students in March 2008.
The dedication and ribbon-cutting ceremony was held in October 2008.
Architect: DH Architects Inc.
Building Construction Cost: $14,897,235
Total Project Cost
(includes such things as site preparation, demolition):
$15,553,928 |
Carson
New Construction/Existing
Site |
 |
 |
 |
(Price Hill)
Construction completed on a
75,310-square-foot school for 550 students on current campus. Front
annex building demolished July 2006 to make space for new building.
Demolition of old two-story building began July 2008. New
building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in
May 2009.
Architect: GBBN Architects Inc.
Building Construction Cost: $14,858,023
Total Project Cost
(includes such things as site preparation, demolition): $19,479,192 |
Fairview
New Construction/New Site |
 |
 |
 |
(Clifton) Construction completed on
84,144-square-foot school for 650 students on former site of Clifton
Schools south building. Demolition of existing building completed
January 2006.
New building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in
September 2008.
Architect: Glaserworks
Building Construction Cost: $14,156,805
Total Project Cost
(includes such things as site preparation, demolition): $15,652,567 |
Kilgour
Renovation and Addition |
 |
 |
 |
(Mt. Lookout) Construction completed on a
23,630-square-foot addition and a full renovation of existing building
for 450 students.
New building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in
September 2008.
Architect: Champlin/Haupt Architects, Inc
Building Construction Cost: $12,849,801
Total Project Cost
(includes such things as site preparation, demolition): $12,250,975 |
South Avondale
New Construction/Existing Site |
 |
 |
 |
(Avondale) Construction completed on
84,144-square-foot school for 650 students. Demolition of old building
completed in January 2006.
New building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in October 2008.
Architect: ATA Beilharz Architects
Building Construction Cost: $15,242,385
Total Project Cost
(includes such things as site preparation, demolition): $16,519,676 |
Pleasant Ridge Montessori
New Construction/Existing Site |
 |
 |
 |
(Pleasant Ridge) Construction completed on
75,310-square-foot school for 550 students. Demolition of old building
completed. New building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in
September 2008.
Architect: SHP Leading Design
Building Construction Cost: $18,410,447
Total Project Cost
(includes such things as site preparation, demolition): $20,417,689 |
Roselawn Condon
Renovation
|
 |
 |
 |
(Roselawn)
Phase I completed
February 2008 on the 550-student building. Phase II included new entrance and
main office, and Phase III included work on the gym and a new art
room. Renovated building opened for students August 2008.
The dedication and ribbon-cutting ceremony was held in
April 2009.
Architect: ATA
Beilharz
Architects
Building Construction Cost: $9,405,943 |
Covedale
New Construction/Existing Site |
 |
 |
 |
(Covedale) Construction completed on a
66,100-square-foot school for 450 students. Demolition of old Covedale
building completed Summer 2006. New building opened for students
January 2009.
The dedication and ribbon-cutting ceremony was held in
May 2009.
Architect: KZF Design
Building Construction Cost: $12,925,357 |
Parker
New Construction/Existing Site |
 |
 |
 |
(Madisonville) Construction completed on a
75,310-square-foot school for 550 students on Parkers campus. New
building opened for students August 2009.
Architect: Voorhis, Slone, Welsh, Crossland Architects
Building Construction Cost: $13,529,397 |
|
Opening Soon
All dates and costs are estimates.
(In anticipated order of completion.) |
Dater Montessori
Renovation
|
 |
 |
 |
(Westwood) Construction bids out Fall
2008. Students moved August 2007 into temporary home at 1700 Grand
Avenue, Price Hill, while renovation under way on building with final
size of 165,636 square feet for 650 students. Construction began
December
2008; finishes Spring 2010.
Architect: Glaserworks
Bid Tabulations:
Building Packages
Building Construction Cost: $17,426,888 |
School for Creative & Performing Arts and Schiel Primary School for
Arts Enrichment
(K-12)
New Construction/New Site |
 |
 |
 |
(Over-the-Rhine) Construction under way on a
250,000-square-foot school for 1,350 students. Topping-out ceremony
held September 2008. SCPA will combine in new building with Schiel
Primary School for Arts Enrichment. Construction began Fall 2007;
finishes Spring 2010.
Fund-raising Campaign
Architect: Cole+Russell, Fanning/Howey, Moody Nolan
Bid Tabulations:
Building Packages
Building Construction Cost: $54,751,533
Total Project Cost (includes such things as site preparation,
demolition): $70,431,261 |
Sands
New Construction/Existing Site
|
 |
 |
 |
|
(Mt. Washington)
Construction under way on an 84,143-square-foot school for 650
students on Sands campus. School operating in existing building
while new building under construction on front of campus. Old building
to be demolished when new one completed. Construction began Fall
2008; finishes Summer 2010.
Architect: SHP Leading Design
Bid Tabulations:
Building Packages,
Site Work
Building Construction Cost: $12,252,637 |
Under
Construction
All dates and costs are estimates.
(In anticipated order of completion.)
Academy of Multilingual Immersion Studies (AMIS)
New Construction/Existing Site
|
 |
 |
 |
(Bond Hill)
Construction bids out September 2008. Students moved August
2007 into
temporary home at 7001 Reading Road, Bond Hill, until construction
completed on a 63,032-square-foot school for 400 students. Demolition
of existing building scheduled for Fall 2008. Construction began
January 2009; finishes Summer 2010.
Architect: GBBN Architects Inc.
Bid Tabulations:
Building Packages
Building Construction Cost: $11,977,688 |
Hughes Center
Renovation |
 |
 |
 |
(University Heights) Construction under way on the
renovation of Classical Building for final size of 290,873 square feet
for 1,200 students. Students moved August 2008 into Professional
Building and an annex at back of campus while renovation work is under
way. The annex will be retained for future expansion. Construction
began Summer 2008; finishes Summer 2010.
Architect: Cole+Russell, Fanning/Howey, Moody Nolan
Building Construction Cost: $39,733,115 |
College Hill
Renovation & Addition |
 |
 |
 |
(College Hill)
Construction bids out Fall
2008. Students moved August 2008 into temporary home at 1402 W. North
Bend Road, College Hill, while work under way on a 31,734-square-foot
addition for a final building of 101,732 square feet for 550 students.
Building construction began April 2009, finishes Summer 2010.
Architect: Moody Nolan,
Inc.
Building Construction Cost: $16,865,034 |
Hartwell
Renovation &Addition |
 |
 |
 |
(Hartwell)
Construction bids out Fall
2008. Students moved August 2008 into temporary home at 125 W. North
Bend Road, Carthage, while Hartwell building is renovated with a
7,000-square-foot addition (a gym) and final size of 84,100 square
feet for 400 students.
Construction work began May 2009, finishes Summer 2010.
Architect: Moody Nolan, Inc.
Building Construction Cost: $13,594,351 |
North Avondale
New Construction/Existing Site |
 |
 |
 |
(Avondale) Students moved August 2008 into
temporary home at 876 Glenwood Avenue, Avondale, until construction
completed on 85,470-square-foot building for 650 students. Demolition
of existing building occurred February 2009. Construction began February 2009; finishes Summer 2010.
Architect: Cole+Russell, Fanning/Howey, Moody Nolan
Bid Tabulations:
Building Packages
Building Construction Cost: 14,369,466 |
R. A. Taft High
New Construction/Existing Site |
 |
 |
 |
(West End) Construction bids out September 2008.
Design completed on 100,200-square-foot school for 600 students.
Students moved January 2008 into temporary home at 2240 Baltimore
Avenue, North Fairmount, until new building completed. Demolition of
old Taft began August 2008. Building onstruction began April 2009; finishes
Spring 2011.
Architect: Voorhis, Slone, Welsh, Crossland Architects
Bid Tabulations:
Environmental Remediation,
Site Work & Demolition,
Building Packages
Building Construction Cost: $18,868,839 |
Up Next
All dates and costs are estimates.
(In anticipated order of completion.)
<%
'get recordset of all elementary schools
strSQL = "select School_Code, School_Name, Address, Zip_code, Phone_Number, FAX_Number, " & _
" Grades, Principal, Interim_Principal, Secretary, School_Times, Email, Map_File, SnapShot_Page, " & _
" School_Web_Site, Report_Card, Facilities_Plan, Program_Focus, " & _
" (case School_Code when '153' then 'Parker' when '310' then 'Bloom' else School_Name end) as School_Name_For_Alphabetizing from School_Data " & _
" where (Grades like '%03%' or Grades like '%06%' and School_Code <> 333) and (Display_in_SL = 1 or Display_in_SL is null)" & _
" order by School_Name_For_Alphabetizing "
Set rsElemSchools = Server.CreateObject("ADODB.Recordset")
rsElemSchools.ActiveConnection = dataconn
rsElemSchools.CursorLocation = adUseServer
rsElemSchools.CursorType = adOpenForwardOnly
rsElemSchools.LockType = adLockReadOnly
rsElemSchools.Source = strSQL
rsElemSchools.Open
If Not (rsElemSchools.BOF and rsElemSchools.EOF) Then
Do Until rsElemSchools.EOF
'for each record found, show all the info from the database
'interpret the grdlevels string
strBegGrade = Left(rsElemSchools.Fields("Grades"), 2)
strEndGrade = Right(rsElemSchools.Fields("Grades"), 2)
If Left(strBegGrade,1) = "P" or Left(strBegGrade,1) = "K" Then
strBegGrade = "K"
End If
If Left(strBegGrade,1) = "0" Then
strBegGrade = Right(strBegGrade, 1)
End If
If Left(strEndGrade,1) = "0" Then
strEndGrade = Right(strEndGrade, 1)
End If
'use the non-breaking tag so that the grade string is not interrupted between lines
strGrades = "(" & strBegGrade & "-" & strEndGrade & ")"
If strBegGrade = strEndGrade Then
strGrades = "(" & strBegGrade & ")"
End If
'interpret the interim principal indicator
strInterim=""
If rsElemSchools.Fields("Interim_Principal") = "True" Then
strInterim = " (Interim)"
End If
strTimes = rsElemSchools.Fields("School_Times")
'format Windsor's school times
If rsElemSchools.Fields("School_Code") = "197" Then
strTimes = Left(rsElemSchools.Fields("School_Times"), InStr(rsElemSchools.Fields("School_Times"), "(W)")+3)
strTimes = strTimes & " " & Right(rsElemSchools.Fields("School_Times"), (Len(rsElemSchools.Fields("School_Times")) - InStr(rsElemSchools.Fields("School_Times"), "(W)")-2))
End If
'format Clifton's school times
If rsElemSchools.Fields("School_Code") = "117" Then
strTimes = Left(rsElemSchools.Fields("School_Times"), InStr(rsElemSchools.Fields("School_Times"), "),")+2)
strTimes = strTimes & " " & Right(rsElemSchools.Fields("School_Times"), (Len(rsElemSchools.Fields("School_Times")) - InStr(rsElemSchools.Fields("School_Times"), "),")-1))
End If
'format Whittier's school times
If rsElemSchools.Fields("School_Code") = "196" Then
strTimes = Left(rsElemSchools.Fields("School_Times"), InStr(rsElemSchools.Fields("School_Times"), "),")+2)
strTimes = strTimes & " " & Right(rsElemSchools.Fields("School_Times"), (Len(rsElemSchools.Fields("School_Times")) - InStr(rsElemSchools.Fields("School_Times"), "),")-1))
End If
strCounter = 0
i = 0
%>
<% If rsElemSchools.Fields("Program_Focus") <> "" Then
%>
<%End If %>
<%
rsElemSchools.MoveNext
Loop
End If
'-----------------------------------SECONDARY SCHOOLS--------------------------------------- %>
<%
'get recordset of all high schools
strSQL = "select School_Code, School_Name, Address, Zip_code, Phone_Number, FAX_Number, " & _
" Grades, Principal, Interim_Principal, Secretary, School_Times, Email, Map_File, SnapShot_Page, " & _
" School_Web_Site, Report_Card, Facilities_Plan, Program_Focus, " & _
" (case School_Code when '410' then 'Taft' else School_Name end) as School_Name_For_Alphabetizing from School_Data " & _
" where (Grades like '%09%' or Grades like '10%') and (Display_in_SL = 1 or Display_in_SL is null) " & _
" order by School_Name_For_Alphabetizing "
Set rsHighSchools = Server.CreateObject("ADODB.Recordset")
rsHighSchools.ActiveConnection = dataconn
rsHighSchools.CursorLocation = adUseServer
rsHighSchools.CursorType = adOpenForwardOnly
rsHighSchools.LockType = adLockReadOnly
rsHighSchools.Source = strSQL
rsHighSchools.Open
If Not (rsHighSchools.BOF and rsHighSchools.EOF) Then
Do Until rsHighSchools.EOF
'for each record found, show all the info from the database
'interpret the grdlevels string
strBegGrade = Left(rsHighSchools.Fields("Grades"), 2)
strEndGrade = Right(rsHighSchools.Fields("Grades"), 2)
If Left(strBegGrade,1) = "P" or Left(strBegGrade,1) = "K" Then
strBegGrade = "K"
End If
If Left(strBegGrade,1) = "0" Then
strBegGrade = Right(strBegGrade, 1)
End If
If Left(strEndGrade,1) = "0" Then
strEndGrade = Right(strEndGrade, 1)
End If
'use the non-breaking tag so that the grade string is not interrupted between lines
strGrades = "(" & strBegGrade & "-" & strEndGrade & ")"
If strBegGrade = strEndGrade Then
strGrades = "(" & strBegGrade & ")"
End If
'exception to grades for Virtual High School
If rsHighSchools.Fields("School_Code") = 943 Then
strGrades = " (9th grade to Age 22)"
End If
'interpret the interim principal indicator
strInterim = ""
If rsHighSchools.Fields("Interim_Principal") = "True" Then
strInterim = " (Interim)"
End If
'SCPA school times needs some formatting
If rsHighSchools.Fields("School_Code") = 333 Then
strTimes = Left(rsHighSchools.Fields("School_Times"), InStr(rsHighSchools.Fields("School_Times"), ")"))
strTimes = strTimes & " " & Right(rsHighSchools.Fields("School_Times"), InStr(rsHighSchools.Fields("School_Times"), ")")+1)
Else
strTimes = rsHighSchools.Fields("School_Times")
End If
'9:00-4:00 (grades 4-8) 8:15-3:15 (grades 9-12)
strCounter = 0
i = 0
%>
<% If rsHighSchools.Fields("Program_Focus") <> "" Then
%>
<% End If %>
<%
rsHighSchools.MoveNext
Loop
End If
'-----------------------------------SATELLITE SCHOOLS--------------------------------------- %>
<%
'get recordset of all satellite schools
strSQL = "select School_Code, School_Name, Address, Zip_code, Phone_Number, FAX_Number, " & _
" Grades, Principal, Interim_Principal, Secretary, School_Times, Email, Map_File, SnapShot_Page, " & _
" School_Web_Site, Report_Card, Facilities_Plan, Program_Focus " & _
" from School_Data " & _
" where Grades is null and (Display_in_SL = 1 or Display_in_SL is null) order by School_Name "
Set rsSatelliteSchools = Server.CreateObject("ADODB.Recordset")
rsSatelliteSchools.ActiveConnection = dataconn
rsSatelliteSchools.CursorLocation = adUseServer
rsSatelliteSchools.CursorType = adOpenForwardOnly
rsSatelliteSchools.LockType = adLockReadOnly
rsSatelliteSchools.Source = strSQL
rsSatelliteSchools.Open
If Not (rsSatelliteSchools.BOF and rsSatelliteSchools.EOF) Then
Do Until rsSatelliteSchools.EOF
'for each record found, show all the info from the database
'interpret the interim principal indicator
strInterim = ""
If rsSatelliteSchools.Fields("Interim_Principal") = "True" Then
strInterim = " (Interim)"
End If
strTimes = rsSatelliteSchools.Fields("School_Times")
strCounter = 0
i = 0
%>
<% If rsSatelliteSchools.Fields("Program_Focus") <> "" Then
%>
<% End If %>
<%
rsSatelliteSchools.MoveNext
Loop
End If
%>
Hoffman-Parham
New Construction/New Site |
 |
 |
 |
(Evanston)
Design approved for a
62,998-square-foot building for 450 students in a merged school on the
Parham site. Parham students moved August 2008 into the Hoffman
building, 3060 Durrell Avenue, Evanston, until construction finished.
Demolition of Parham building scheduled for Summer 2009. Construction
begins October 2009; finishes Spring 2011.
Architect: DH Architects, Inc
Building Construction Cost: $11,669,783 |
Clark
New Construction/Existing Site |
 |
 |
 |
(Hyde Park)
Students moved August 2007 to 5425
Winton Ridge Lane, Winton Hills, until construction completed on a
102,174-square-foot building for 600 students. Demolition of old
building completed April 2009. Construction to begin Spring 1010..
Architect: Glaserworks
Bid Tabulations:
Demolition,
Environmental Remediation
Building Construction Cost: $18,098,865 |
Chase
New Construction/Existing Site |
 |
 |
 |
(Northside)
Students moved August 2007 into temporary home at 1710 Bruce Avenue,
Northside, until construction completed on a 67,274-square-foot school
for 450 students.
Construction begins
Spring 2010.
Architect: Cole + Russell, Fanning/Howey, Moody Nolan
Bid Tabulations:
Demolition
Building Construction Cost: 12,443,638 |
Western Hills/Dater
Renovation
|
 |
 |
 |
(Western Hills)
Students moving into
temporary homes in 3 phases during Summer 2009
−
in modulars on site
and in Dater High School basement. Construction scheduled to begin
September 2009. Renovation scheduled
to finish 2011 until construction complete on renovated schools for
1900 students.
Architect: SFA Architects
Building Construction Cost: $51,716,341 |
Future Projects
All dates and costs are estimates.
(In alphabetical order.)
Aiken
New Construction/Existing Site |
 |
 |
 |
On November 27, 2006,
the Board reduced the enrollment capacity of the school by 600
students in grades 7-12 for a total capacity of 1000 students.
Students expected to move to temporary swing space Summer 2010.
Architect: Voorhis, Slone, Welsh, Crossland Architects
Building Construction Cost: $29,304,753 |
Mt. Washington
Renovation |
 |
 |
 |
On November 27, 2006,
the Board increased the enrollment capacity of the renovated school by
50 students for total capacity of 400 students.
Architect: Moody Nolan Inc.
Building Construction Cost: $14,894,869 |
Oyler
Renovation |
 |
 |
 |
Students will move to a temporary location in Summer
2010, when renovation begins on a school renovation for 650
students.
Architect: Roth Partnership |
Rothenberg
Renovation & Addition |
 |
 |
 |
(Over-the-Rhine) Design under way for a renovated
building for 550 students. Several lots purchased around existing
school will enlarge campus for playground, green space and an 11,120
square-foot gymnasim. Students
temporarily using building at 2120 Vine Street, Over-the-Rhine.
Architect:
WA Architects Inc. & GBBN Architects Inc.
Building Construction Cost: 16,907,400 |
Sayler Park
Renovation
|
 |
 |
 |
On November 27, 2006,
the Board reduced the enrollment capacity of the renovated school by
50 students, for a total capacity of 400 students. Students scheduled
to move December 2009 into modulars on site while renovation is under
way. Construction begins Spring 2010.
Architect: Roth Partnership |
Silverton
New Construction/Existing Site |
 |
 |
 |
On November 27, 2006,
the Board increased the enrollment capacity of the new school by 50
students for a total capacity of 400 students. Construction begins
Fall 2010.
Architect: GBBN Architects Inc.
Building Construction Cost: $14,007,563 |
W. H. Taft Elementary
New Construction |
 |
 |
 |
On November 27, 2006,
the Board reduced the enrollment capacity of the renovated school by
50 students for a total capacity of 400 students.
Architect: DH Architects |
Walnut Hills
Renovation
|
 |
 |
 |
|
Renovation
planned for a school with a capacity of 1900 students.
Architect: SHP
Leading Design |
West Side Montessori High School
Renovation of an Existing Site |
 |
 |
 |
|
(Undetermined)
Students moved August 2007 into their
temporary home at the former Jacobs Center, 5425 Winton Ridge Lane.
Location of permanent home to be determined. (On November 27, 2006,
the Board removed a new building for the new Montessori high school
from the Facilities Master Plan.) |
Westwood
Renovation
|
 |
 |
 |
(Westwood)
Design under way to renovate the building for
400 students. Students moved August 2007 into temporary home at 2601
Westwood Northern Blvd., Westwood. Construction begins Summer 2010.
Architect: Roth Partnership
Building Construction Cost: 14,433,731 |
Winton Montessori
New Construction/New Site |
 |
 |
 |
The Winton Montessori
building on Winton Road (formerly Winton Place School) will close when
the Montessori school moves into a new building on the Schwab School
site on Beech Hill Avenue. The building on the Schwab site will be
demolished before construction begins on new 75,000 square-foot Winton
Montessori building built for 650 students. Construction begins
Fall 2010.
Architects: Cole+Russell, Fanning/Howey, Moody Nolan
Building Construction Cost: $16,639,331 |
Woodford
New Construction |
 |
 |
 |
A new building will
be built for a capacity of 550 students. Construction begins Spring
2010.
Architect: GBBN Architects Inc. |
Removed from
Plan
Bloom
Discontinue Use |
 |
 |
 |
|
Bloom closed June
2006. |
Burton
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Burton from the Facilities Master Plan. The
school will close and students will be reassigned. Burton will close
June 2008. |
Bramble
Discontinue Use |
 |
 |
 |
|
Bramble closed spring
2005. The building is now being used by Pleasant Ridge School until
its new building is completed. |
Central Fairmount
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Central Fairmount from the Facilities Master
Plan. The school closed and students were reassigned. |
Gamble
Removed from Plan
|
 |
 |
 |
|
On November 27, 2006,
the Board removed Gamble from the Facilities Master Plan. The
school closed and students were reassigned. The building is being
used now as a temporary home of Westwood School while the Westwood
building is being renovated. |
Heberle
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Heberle from the Facilities Master Plan. The
school closed and students were reassigned. |
Hoffman/Parham School
New Construction/New Site |
 |
 |
 |
|
On November 27, 2006,
the Board decided to consolidate Hoffman and Parham into
one school, effective Summer 2008. Students will attend school
in the Hoffman building while a new school is constructed on the
Parham site. |
Hyde Park
Removed
from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Hyde Park from the Facilities Master Plan. Hyde
Park School closed spring 2005. The Hyde Park building is being
temporarily used by Mt. Washington School while its building is renovated. |
Jacobs
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed the Jacobs building from the Facilities Master
Plan. (The school closed and students moved to
the Aiken campus in August 2005.) The building is being temporarily
used by Clark and West Side Montessori schools. |
Losantiville
Discontinue Use |
 |
 |
 |
|
Losantiville closed
spring 2005. |
Military Academy
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed a new building for a military academy from the
Facilities Master Plan. |
Porter
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Porter from the Facilities Master Plan. (Porter
School merged with Hays in the fall of 2000 and was slated to be
replaced with a new building. The original Porter building was
demolished in 2004.) |
Quebec Heights
Removed from Plan |
 |
 |
 |
|
On November 27, 2006,
the Board removed Quebec Heights from the Facilities Master
Plan. The school will be closed and students will be reassigned. The
date for closing has not been determined. |
Schwab
New Construction/Existing Site |
 |
 |
 |
|
The new building will become the new home of Winton
Montessori School.
On November 27, 2006,
the Board reduced the enrollment capacity of the new building by 100
students. (Schwab School will close Summer 2008 and students will be reassigned.) |
Washington Park
Removed from Plan |
 |
 |
 |
On November 27, 2006,
the Board removed Washington Park from the Facilities Master
Plan. The school closed and students were reassigned. The building was
demolished Fall 2007.
Bid Tabulation:
Demolition |
West Side Montessori High School
Renovation of an Existing Site |
 |
 |
 |
|
(Undetermined)
Students moved August 2007 into their
temporary home at the former Jacobs Center, 5425 Winton Ridge Lane.
Location of permanent home to be determined. (On November 27, 2006,
the Board removed a new building for the new Montessori high school
from the Facilities Master Plan.) |
Whittier
Removed from Plan |
 |
 |
 |
On November 27, 2006,
the Board removed a new building for Whittier from the
Facilities Master Plan. Students moved August
2006 into the new Rees E. Price School on Considine Avenue, Price
Hill. The building was demolished January 2008.
Bid Tabulation:
Demolition |
|
9/2009 |
|